Craigieburn North Employment Area Precinct Structure Plan

Amendment C198 to the Hume Planning Scheme

The Craigieburn North Employment Area Precinct Structure Plan was approved by the Minister for Planning and gazetted on 25 August 2016 under Amendment C198 to the Hume Planning Scheme.

To view a copy of the final documentation, including the Craigieburn North Employment Area Precinct Structure Plan, refer to:

Amendment VC249

The Development Contributions Plan (DCP) for this precinct was amended as a result of Amendment VC249. 

On 15 January 2024, Amendment VC249 came into effect to further facilitate the development of small second dwellings introduced by Amendment VC253. Amendment VC249 exempts development for a small second dwelling from existing development contributions plans. The changes ensure an applicant does not pay a development contribution when a small second dwelling is developed. 

For further information, refer to: 

Public Access to Spatial Data

The Victorian Planning Authority (VPA) makes spatial data for gazetted plans available through the use of an online ‘Open Data’ portal. Spatial Data available for this precinct is provided for reference only and holds no official status. Please see our Open Data page for a detailed description of the data and links to download.

Supporting Documentation

Craigieburn North Employment Area PSP - August 2016
Craigieburn North Employment Area PSP - August 2016 PDF  Version
Craigieburn North Employment Precinct Development Contributions Plan - June 2016 (Amended December 2023)
Craigieburn North Employment Precinct Development Contributions Plan - June 2016 (Amended December 2023) PDF  Version
PSP 25.1 Craigieburn North - 25 2 English Street - Infrastructure Costing Study - ~ 22 August 2014
PSP 25.1 Craigieburn North - 25 2 English Street - Infrastructure Costing Study - ~ 22 August 2014 PDF  Version
PSP 25.1 Craigieburn North and PSP 25.2 English Street Infrastructure Costing ~ Bridge GA 0202)(2)
PSP 25.1 Craigieburn North and PSP 25.2 English Street Infrastructure Costing ~ Bridge GA 0202)(2) PDF  Version
PSP 25.1 Craigieburn North and PSP 25.2 English Street Infrastructure Costing Study - ~ Sheet 12)
PSP 25.1 Craigieburn North and PSP 25.2 English Street Infrastructure Costing Study - ~ Sheet 12) PDF  Version
Craigieburn North Employment Area PSP and English Street PSP - Infrastructure Costing Study - Sheet 20)(2)
Craigieburn North Employment Area PSP and English Street PSP - Infrastructure Costing Study - Sheet 20)(2) PDF  Version
Craigieburn North Employment Area PSP and English Street Infrastructure Costing Study - Drawing Set 3 (Sheet 21 - Bridge GA 0202)
Craigieburn North Employment Area PSP and English Street Infrastructure Costing Study - Drawing Set 3 (Sheet 21 - Bridge GA 0202) PDF  Version