What impacts will the BREP have on existing utility and service infrastructure?

Most existing services are located in Marong township and have limited capacity to support development of the BREP. To address this, the VPA and Development Victoria commissioned technical studies to assess the impacts of the precinct on existing networks and identify future servicing needs. These studies were developed in consultation with utility and network providers to ensure that critical infrastructure, such as power, water, sewerage and telecommunications, is planned and coordinated early. The outcomes provide a draft servicing and road network layout, together with staging requirements, to guide the preparation of future development plans.