What technical assessments and background studies are typically required to inform preparation of a PSP or Strategic Planning Project?

Precinct Structure Plans (PSP) are complex and require a range of Technical Assessments to be undertaken to assist in delivering a robust plan.  Technical assessments and background studies are incorporated into Third-Party Funding agreement costs. The Victorian Planning Authority (VPA) procures external consultants and technical experts to complete these assessments which may include (but not be limited to) the following: 

  • Biodiversity
  • Aboriginal cultural heritage and values
  • Bushfire
  • Land capability
  • Arboriculture
  • Landscape & visual
  • Post-settlement heritage
  • Community infrastructure 
  • Economic and retail
  • Transport modelling
  • Integrated transport
  • Integrated water management
  • Sodic soils
  • Co-design workshops
  • High level servicing and infrastructure
  • Infrastructure costings and design
  • Land valuations
  • Public Exhibition (including Printing, advertising, engagement)
  • Planning Panels (including Panel fees, legal, and expert consultants)
  • Supplementary or Standard ICP costs (including Additional costings and design, legal, experts and panel fees).