26/06/2025
What about infrastructure in the precinct?
The development contributions plan (DCP) has been developed in response to a range of technical water, transport and community assessments. (These assessments are available on the VPA project page). The items identified have been included in the DCP and allocated a timing for their delivery in line with demand from the precinct.
Infrastructure in the DCP has been identified in consultation with Greater Shepparton City Council, Goulburn Broken Catchment Management Authority, Department of Planning and Transport, Goulburn-Murray Water, Goulburn Valley Water, Department of Education and Department of Health.
In addition, consultation has occurred with utility providers, such as Telstra, NBN Co and PowerCor, which has advised that the PSP will be serviceable into the future through developer-led expansions to their networks.